this post was submitted on 01 Jun 2024
257 points (97.8% liked)
Technology
59151 readers
3506 users here now
This is a most excellent place for technology news and articles.
Our Rules
- Follow the lemmy.world rules.
- Only tech related content.
- Be excellent to each another!
- Mod approved content bots can post up to 10 articles per day.
- Threads asking for personal tech support may be deleted.
- Politics threads may be removed.
- No memes allowed as posts, OK to post as comments.
- Only approved bots from the list below, to ask if your bot can be added please contact us.
- Check for duplicates before posting, duplicates may be removed
Approved Bots
founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
It's not because of smr, it's just that all large projects have this level of corruption and grift.
Skill issue. I can't even blame capitalism, since the french manage to get almost 90% of their power from nuclear.
China has 53 GW installed, 25 GW under construction, and another 47 GW planned. Generally they're pretty clear-eyed when it comes to major projects like this, so I think we can infer the availability of cheap hydro and solar doesn't favor doing more than ~15% nuclear since they're only planning to increase it by 150% over the next couple decades.
Maybe that will change when they set up long term storage/reprocessing.
IIRC the French reactors are all nearing their end of service life and'll be decommissioned soon.
Surely you made a typo? 50 MW is a tenth of the electrical yield of the smallest PWR you can profitably operate.
Off by a factor of 1000. That's why I'm not a nuclear engineer.